O1
Justice Center & WC Office Building Fall Protection Anchors
Installation of 135 anchors between the Wake County Justice Center (built circa 2005) & Wake County Office Building (built in the 1950s) for exterior building maintenance and access. There is a very different internal construction between buildings that required extensive layout and structural assessment for anchor placement. Owner is Wake County Facilities Design & Construction.
Challenges
Varying structural characteristics across each building’s unique roof design & interior accessibility.
Many locations requiring access in high-profile and secure areas of the building.
Challenging weather conditions for roof patching & waterproofing.
Solutions
Close coordination between design team, engineering and installation team. Efficiently communicated varying field conditions, and offering solutions that meet project design specifications.
Our team operated efficiently, communicating complex installation schedule to meet individual office/occupant requirements.
Operate with adaptive scheduling to maintain install schedule and productivity.
Overall, this project demonstrated our company’s ability to schedule a complex installation, provide effective coordination and communication of information in a highly variable environment, leading to a safe and effective installation of a critical long-term element of the facility.
ADDITIONAL FEATURED PROJECTS
02
Lineberry Hall Auditorium Renovation
Renovation of the access control and acoustical ceiling replacement for the Lineberry Hall Auditorium at the Governor Morehead School.
03
Construction of roof canopy and loading dock renovation at the offices of the NC State Medical Examiner.
DHHS Loading Dock
04
High Tide Salon
Conversion and build out of new retail hair salon in Raleigh’s downtown warehouse district.